Checklist

Back to flight
TAKEOFF PROCEDURE (1/3)
Item Expected Done Source Updated
Before entering the runway: Departure runway correct Verify No — —
Entering the runway: Strobe light ON No — —
Entering the runway: Other lights As needed No — —
Entering the runway: Transponder TA/RA No — —
After clear for takeoff: Fixed landing lights ON No — —
After clear for takeoff: Thrust levers Approx. 40% N1 No — —

0 of 6 items completed in this section.

TAKEOFF PROCEDURE (2/3)
Item Expected Done Source Updated
After engines stabilize: TO/GA switch Push No — —
At VR: Rotate toward 15° pitch No — —
At positive climb: Landing gear lever UP No — —
Above 400 ft: Roll mode Select or verify No — —
Above 400 ft: Flaps Retract as scheduled No — —

0 of 5 items completed in this section.

TAKEOFF PROCEDURE (3/3)
Item Expected Done Source Updated
After flaps and slats retracted: VNAV mode SET No — —
After flaps and slats retracted: Autopilot As needed No — —
After flaps and slats retracted: Engine start switches As needed No — —
After flaps and slats retracted: Autobrake OFF No — —
After flaps and slats retracted: Landing gear lever OFF No — —

0 of 5 items completed in this section.

CLIMB AND CRUISE PROCEDURE (1/1)
Item Expected Done Source Updated
At or above 10,000 ft: Landing lights OFF No — —
At or above 10,000 ft: Passenger sign As needed No — —
At transition altitude: Altimeter Set STANDARD No — —
At transition altitude: Altimeter crosscheck Verify No — —
Before top of descent: MOD route for arrival As needed No — —
Before top of descent: RNP for arrival Verify No — —

0 of 6 items completed in this section.