Checklist

Back to flight
TAKEOFF PROCEDURE (1/3)
Item Expected Done Source Updated
Before entering the runway: Departure runway correct Verify Yes Pilot 2026-11-03 22:06
Entering the runway: Strobe light ON Yes Pilot 2026-11-03 22:06
Entering the runway: Other lights As needed Yes Pilot 2026-11-03 22:06
Entering the runway: Transponder TA/RA Yes Pilot 2026-11-03 22:06
After clear for takeoff: Fixed landing lights ON Yes Pilot 2026-11-03 22:06
After clear for takeoff: Thrust levers Approx. 40% N1 Yes Pilot 2026-11-03 22:09

6 of 6 items completed in this section.

TAKEOFF PROCEDURE (2/3)
Item Expected Done Source Updated
After engines stabilize: TO/GA switch Push Yes Pilot 2026-11-03 22:09
At VR: Rotate toward 15° pitch Yes Pilot 2026-11-03 22:09
At positive climb: Landing gear lever UP Yes Pilot 2026-11-03 22:09
Above 400 ft: Roll mode Select or verify Yes Pilot 2026-11-03 22:09
Above 400 ft: Flaps Retract as scheduled Yes Pilot 2026-11-03 22:09

5 of 5 items completed in this section.

TAKEOFF PROCEDURE (3/3) (active)
Item Expected Done Source Updated
After flaps and slats retracted: VNAV mode SET Yes Pilot 2026-11-03 22:10
After flaps and slats retracted: Autopilot As needed Yes Pilot 2026-11-03 22:10
After flaps and slats retracted: Engine start switches As needed Yes Pilot 2026-11-03 22:10
After flaps and slats retracted: Autobrake OFF Yes Pilot 2026-11-03 22:10
After flaps and slats retracted: Landing gear lever OFF No — —

4 of 5 items completed in this section.